Design calculations for form work of PIER

I have learn about the form work of PIER.  Form work is the term given to either temporary or permanent molds into which concrete or similar materials are poured.

I have make spreadsheet with help of Dr. Harvinder Singh and Dr. H.S RAI . The calculations for form work of pier is done by reading IS code 14687 and IS code 875 (Part-3). To understand the calculations is little difficult for me but finally i completed my work on time. It is easy to make spreadsheet by putting formulae and also i learnt more commands which make easy to make spreadsheet. To know more about the form work then click to;  https://www.google.co.in/search?q=formwork&oq=formwork&aqs=chrome..69i57j0l5.6269j0j7&sourceid=chrome&es_sm=93&ie=UTF-8

IMPERIAL TOWER IN MUMBAI

800px-Imperial_Tower

This the imperial tower in Mumbai. Imperial Towers, designed by Mumbai architect Hafeez Contractor as his most recognizable project to date, were designed as Mumbai’s tallest towers.The Imperial Twin Towers are built on former slum land where the current re-development model of builders providing free land and rehabilitation to slum dwellers in exchange for rights for property development, was first put into practice on a big scale. As for more detail click on link

https://en.wikipedia.org/wiki/The_Imperial_%28Mumbai%29#cite_note-2

ESTIMATION AND COSTING

 

estimating-and-costing-in-civil-engineering-theory-and-practic-400x400-imadffkegyzwwhjh

I have done estimating and costing of a project. I feel difficulty in calculations because, the calculations  are difficult and too lengthy . But my group with a great effort complete whole estimating. We taken time to complete this work is 6 days. While calculating we face a lot of problem but it is interesting to do while solving it.